Basic Info.
Model NO.
DK22585
Material
Brass
Transport Package
Carton Packing
Specification
As customer′s request
Trademark
As customer′s request
Origin
China
Production Capacity
10000PCS/Month
Product Description
Pressure reducer inert gas Argon/CO2
1, Technical datas:
PRESSURE REDUCER
Bottle connection: W 21.0 x 1/14 "
The left display shows the filling quantity of the gas bottle in cash
right display shows the flow rate in l / min
right controller (small) opens and closes the flow (open right / left close)
lower regulator (large) sets the flow rate a (increase right / reduce left)
Tip: the average amount of shielding gas (argon 4.6) For TIG welding, it is 8-10 in a calm room l / min
Tip: the rule of thumb applies to MIG / MAG welding Wire diameter x 10 results in the optimal flow rate l / min
Application | Argon, Co 2, protective gas, mixed gas |
Bottle connection | W 21.8 x 1/14 " |
Hose tube | 5-7mm |
Material | brass |
Weight | 540g |
Dimensions | approx. 11x11x11 cm |
Flow rate | 0-20 l / min |
max. Pressure bottle manometer | 300 bar |
Company Profile
Derkia Automation Technology Co.,Ltd is the global market leader in pressure gauge, gas regulator and temperature measurement technology. We work with our customers to develop comprehensive solutions based on our high-quality measurement technology components, which are ultimately integrated into their business processes. The products include pressure gauges, gas pressure regulator, pressure switches, thermometers and more, we always provide solutions for pressure and temperature measurement and control systems. We deliver millions of quality products to more than 100 countries every year. With advanced equipment and excellent management, we have won a good reputation from all customers.
Packaging & Shipping
FAQ
Q:What do I need for offering a quote?
A: Please offer us product photo,quantity,application,or samples.Then we will quote the best price within 24 hours for you.
Q:How about the MOQ?
A:MOQ depends on your need ,besides,we welcome trial order before mass-production.
Q:What is the delivery time?
A:Usually it takes 15-25days after customer confirms the order.
Q:What kind of payment terms do you accept?
A:T/T,L/C,Escrow,paypal,western union,moneygram.
Q:Is it possible to know how is my product going on without visiting our company?
A:We will offer a detailed products schedule and send weekly reports with digital pictures and vedios which show the machining progress.